For example; what articles if any is keeping someone from running 2 200a main breaker sub panels in different locations of a building (100s of feet apart) independently from the lugs of a fused 400a service disconnect. Or would you be required to parallel and "join" it at the other end? Would these be considered feeder taps and the length, being too long, requires you to join it as a parallel feed and tap disconnects from its end and run to panels from there? I've always thought that the parallel is correct but just not sure how to back it up with the nec...