dburney
Member
- Location
- Brooklet ga usa
I have a pvc underground changing to rmc comeing out the ground going to a meter can my question is should the rmc be supported between the ground and meter can. Their is no support on the conduit unless the consider the ground the support and should it be supported within 18" of the can or 3' and where can I find this in the code book