1200 A to be run from 1000kVA 480Y/277 utility XFR SEC to SWBRD.
Breaking it up into 4 x 300A parallel runs.
So using 4 PVC Sched 80 conduits which will be located beside each other and underground.
Question A
Can the separate phases occupy same conduit???? :?
I believe I have seen this allowed per NEC if conduit is plastic.
It would make for very neat and organized wiring.
Question B
Are two wires allowed per lug???:?
Breaking it up into 4 x 300A parallel runs.
So using 4 PVC Sched 80 conduits which will be located beside each other and underground.
Question A
Can the separate phases occupy same conduit???? :?
In other words:
Can all phase A be in first conduit?
All phase B in second conduit?
All phase C in third conduit?
All neutrals in fourth conduit?
Can all phase A be in first conduit?
All phase B in second conduit?
All phase C in third conduit?
All neutrals in fourth conduit?
I believe I have seen this allowed per NEC if conduit is plastic.
It would make for very neat and organized wiring.
Question B
Are two wires allowed per lug???:?