overrated equipment ground per engineer.

Status
Not open for further replies.

texie

Senior Member
Location
Fort Collins, Colorado
Occupation
Electrician, Contractor, Inspector
Oh, and I stick by ma story, that bonding jumper is still overrated by two sizes! :p

OK, you win this part-it would be NEC compliant as I mentioned in my post #10 with a 1/0 CU. But as iwire correctly noted, in this case the contract drawings should prevail.:)
 
Status
Not open for further replies.
Top