NEC User
Senior Member
- Location
- Marlboro, NJ, USA
I'm designing a data center (significant amount of IT loads) with a back-up generator and I'm trying to determine if I should use a 3 pole or 4 pole ATS. Should the fact that the generator will back up sensitive electronic equipment affect my decision?