User Tag List

Page 3 of 3 FirstFirst 1 2 3
Results 21 to 23 of 23

Thread: Rough in for single family dwelling

  1. #21
    Join Date
    Jun 2013
    Location
    Massachusetts
    Posts
    94
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by CONDUIT View Post
    At what point do you start roughing in the romex for a single family dwelling? after roof is on..... after shingles are on......after roof and windows are in?
    A lot of jurisdictions want the house water tight.

  2. #22
    Join Date
    Mar 2005
    Posts
    206
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    On the larger homes we do, we try to get everything nailed up after roof is blacked in, then drill out and pull wire after the tinners are 2/3rds the way along. Smaller houses other trades done and gone before we start.

  3. #23
    Join Date
    Oct 2003
    Location
    Big Bear Lake, CA
    Posts
    733
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by eds View Post
    On the larger homes we do, we try to get everything nailed up after roof is blacked in, then drill out and pull wire after the tinners are 2/3rds the way along. Smaller houses other trades done and gone before we start.
    Yep, same here.
    Bob on the left coast.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •