    Quote Originally Posted by PaulMmn View Post
    Setting light poles is EC or rigger job? << If the EC has the bucket/crane truck to set the poles, go for it. Who pours the foundation and sets the anchor bolts? EC can't get mad at anyone else if he did the base and bolts aren't set in correct pattern

    Running 4" RMC at a 30 foot ceiling - EC or rigger job? << EC-- with a pair of scissor lifts, one at each end of the pipe.

    Hanging large luminaire - EC or rigger job? << EC-- with a scissor lift; probably 2 guys up there.

    Setting a large switchboard or MCC in place? << EC-- but who drives the fork lift? Don't you have to be 'licensed' to drive one in most plants?In the operating portion of existing plant, usually, New plant under construction or a new addition with primarily only the construction crews in there maybe not.


    Company I worked for had a fireproof safe/vault to be installed, and later, moved. It's about 6' wide, 7' tall, and 4' deep. Weighs the proverbial ton. It was definitely a 'rigger' job! Was remodeling a bank maybe 25 or so years ago. New vault was built, I was there the day the vault door showed up. I don't recall what it weighed, but they rounded up a fairly large forklift from nearby lumber yard to unload it from the truck. The installers had equipment to handle it once it was off the truck. They tried to lift it and back wheels of fork lift come off the ground. They asked me and a couple other guys working there (from GC's crew) to help. We sat on back end of fork lift to help counter balance it. Might not have been good with OSHA had something gone wrong All we needed to do was get it off truck, the installers were able to take it from there. This lift should have been able to lift well over a proverbial ton.


    When the OP mentioned several 500# displays, I imagined they were electronic display panels, like one of those signboard complexes dangling overhead at the airport-- 3 or 4 screens around a central mount. As someone asked-- how strong is the ceiling? Hopefully someone else designed for it, OP is primarily an estimator.


    I think the decision has to be based on the EC doing the job-- what are their skills, equipment, training, etc. Not every EC has the right mix to do every job.
    I can agree with that. Don't know if OP's company is selling and responsible for installing these items or not. If a sign company is involved you would think they would hang them, OP's company may run some wiring to them, then sign company likely installs/confirms software side of it is working also.
    I live for today, I'm just a day behind.

  2. #22
    Join Date
    Jul 2003
    Location
    New Jersey
    Posts
    27,378
    Mentioned
    1 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by mstrlucky74 View Post
    Our union claims the work since there is power/data( we are doing the power and data) being brought to the unit.
    I'm sure that your company has competent journeymen who can hang these units, if not call the hall. Work=money so why give any of it away.
    Rob

    Moderator

    All responses based on the 2014 NEC unless otherwise noted

  3. #23
    Join Date
    Dec 2007
    Location
    NE Nebraska
    Posts
    41,338
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by mstrlucky74 View Post
    Our union claims the work since there is power/data( we are doing the power and data) being brought to the unit.
    Did your company sell these items? Is your company responsible for replacement/repair if you damage them while handling them?

    Not saying you shouldn't hang them, just that it may not be worth it to hang them in some conditions. If you made a markup from selling them, that helps offset some the cost risks should you damage them. If you raised your bid price to cover cost of hanging them, may come out ok as well. If you just said we will do this (for whatever reason) but didn't factor in any additional costs to add to the bid/job price and something happens, may not break the bank, but can still lower profits. You need to know what those numbers are an how much they might hurt.
    I live for today, I'm just a day behind.

  4. #24
    Join Date
    Jul 2005
    Posts
    930
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by mstrlucky74 View Post
    Our union claims the work since there is power/data( we are doing the power and data) being brought to the unit.
    How was this work estimated?

  5. #25
    Join Date
    Mar 2003
    Location
    New York
    Posts
    1,916
    Mentioned
    2 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by kwired View Post
    Did your company sell these items? Is your company responsible for replacement/repair if you damage them while handling them?

    Not saying you shouldn't hang them, just that it may not be worth it to hang them in some conditions. If you made a markup from selling them, that helps offset some the cost risks should you damage them. If you raised your bid price to cover cost of hanging them, may come out ok as well. If you just said we will do this (for whatever reason) but didn't factor in any additional costs to add to the bid/job price and something happens, may not break the bank, but can still lower profits. You need to know what those numbers are an how much they might hurt.
    If we didn't sell the unit and are just hitting power/data, why would you want to fight the company providing the units? HVAC provides and sets the units we hit them with power, control could be by others, what does your bid say?

  6. #26
    Join Date
    Sep 2012
    Location
    NJ
    Posts
    2,556
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by cdslotz View Post
    How was this work estimated?
    What do you mean?

  7. #27
    Join Date
    Sep 2012
    Location
    NJ
    Posts
    2,556
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by kwired View Post
    Did your company sell these items? Is your company responsible for replacement/repair if you damage them while handling them?

    Not saying you shouldn't hang them, just that it may not be worth it to hang them in some conditions. If you made a markup from selling them, that helps offset some the cost risks should you damage them. If you raised your bid price to cover cost of hanging them, may come out ok as well. If you just said we will do this (for whatever reason) but didn't factor in any additional costs to add to the bid/job price and something happens, may not break the bank, but can still lower profits. You need to know what those numbers are an how much they might hurt.
    Furnished by others installed by us. We figured for the install.

  8. #28
    Join Date
    Jul 2003
    Location
    New Jersey
    Posts
    27,378
    Mentioned
    1 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by mstrlucky74 View Post
    Furnished by others installed by us. We figured for the install.
    Pretty standard for your area. 500 pounds isn't that heavy so it shouldn't be a problem.
    Rob

    Moderator

    All responses based on the 2014 NEC unless otherwise noted

  9. #29
    Join Date
    Jul 2005
    Posts
    930
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by mstrlucky74 View Post
    What do you mean?
    How much labor do you have to hang these?
    How much did you include for lifts/rigging?
    How much did you include for supports for 550 lb units (welding, strut,etc) and were there structural details for this on the drawings?

    very easy question.....

  10. #30
    Join Date
    Dec 2007
    Location
    NE Nebraska
    Posts
    41,338
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by cdslotz View Post
    How was this work estimated?
    Quote Originally Posted by mstrlucky74 View Post
    Furnished by others installed by us. We figured for the install.
    Quote Originally Posted by cdslotz View Post
    How much labor do you have to hang these?
    How much did you include for lifts/rigging?
    How much did you include for supports for 550 lb units (welding, strut,etc) and were there structural details for this on the drawings?

    very easy question.....
    I think they had it included in bid/other agreements. If they didn't factor in enough cost, then they lose on some profits.