    Quote Originally Posted by iceworm View Post
    Hummm --
    You just got demoted to "Engineer-of-Record". And the customer needs to have a price before they have a scope. Hopefully you have a good relationship with the customer - if not, well, "yer screwed" (using precise engineering terms - of course)

    Maybe:
    work up a scope for a generic.
    price out material and labor for a PLC with sufficient I/O
    Price out material and labor for a VFD(s)
    Be specific about the material you are providing.
    Be specific any changes to meet their scope changes are extras

    And absolutely charge for your engineering. You probably can't call it "engineering" - but you will think of something to call it that you can bill for.
    I don’t care too much. They are hard to work with. Not too many PLC guys in the vicinity and they can use the experience if they want this one. I’m old.

    Eta: They were discussing where and if they would have electric slide gates and how they would be operated. That was tabled for further discussion and in the next breath they wanted a price worked up for the whole project. How many motors do they have? That’s a question for you, because they couldn’t answer it.
    Last edited by ptonsparky; 04-26-19 at 03:30 PM.
    Tom
    TBLO

  2. #12
    Join Date
    Jul 2006
    Location
    Roughly 5346 miles from Earls Court
    Posts
    2,854
    Mentioned
    1 Post(s)
    Tagged
    0 Thread(s)
    Kind of reminds me of the old architectural spec for a house as written by a business consultant (I can't remember the whole thing)- the house is to have between 3 and 25 rooms on at least two floors (to be determined), plan and equip for a future basement, any exterior color is acceptable but my wife likes blue..... etc

  3. #13
    Join Date
    Mar 2014
    Location
    South Florida
    Posts
    363
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by ptonsparky View Post
    Its all being replaced in some form or fashion in the next couple months which will lead to another thread on how the heck to give a price to someone that does not know what or how they want to do what they think they want done. Logic?
    part of the art of being a consultant is extracting what a customer actually wants from what they are telling you. the tree swing cartoon comes to mind. the worst is when you give them what they describe and it gets installed that way. they call you and say, "this isn't what i wanted."

    looking forward to that thread

  4. #14
    Join Date
    Jun 2003
    Location
    NE (9.06 miles @5.9 Degrees from Winged Horses)
    Posts
    11,229
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by drktmplr12 View Post
    part of the art of being a consultant is extracting what a customer actually wants from what they are telling you. the tree swing cartoon comes to mind. the worst is when you give them what they describe and it gets installed that way. they call you and say, "this isn't what i wanted."

    looking forward to that thread
    My SIL asked me about that project. As I told him I suspect that CEO will bend himself over backwards before calling back. He didn't like the number of zeros on my WAG.
    Tom