kenaslan
Senior Member
- Location
- Billings MT
I know that the NEC requires 125% for continuous loads. Does anyone know if the CEC also requires it?
I have a small transformer space heater 1.5KW @ 120V 150 feet in length.
I was thinking of using Teck 90 cable 10AWG on a cable tray. 0.7 derating for 9 wires
Ken
I have a small transformer space heater 1.5KW @ 120V 150 feet in length.
I was thinking of using Teck 90 cable 10AWG on a cable tray. 0.7 derating for 9 wires
Ken