On a critical care branch circuit for a nursing home, is the wiring required to be hard piped or is the use of hospital grade MC acceptable?
Also if the patient bedrooms being served are existing rooms and have existing walls would the use of Hosp. MC be acceptable to be routed through any existing walls for power and lighting?