I am currently drawing up plans for a new residential service and had some questions about bonding. This is my first generator/transfer switch setup. I would like to have everything in the screenshot below, except the Generator disconnect be considered “Service Equipment”. NEC 2020 for my area and POCO requires grounding in the meter base. 1 meter base with 400/320 amp service. Disconnect to the left side of meter which goes to inside panel 1. Transfer switch to right side of meter, bonded and a disconnect to the right. So that being said, I have 2 questions. Can the disconnect after the transfer switch also be bonded? Water line enters into the basement of this house and it is all copper. Will the water line be bonded to one of the exterior disconnects?