JDB3
Senior Member
- Location
- San Antonio, Texas
Feeder to a sub-panel that has less than 100 amp load, but feed with a 100 amp breaker & feeder will be 130 feet with contact with insulation on each end for approximately 8 feet at each end. Connected to Square D breaker on one end & Square D panel lugs on other end.
Permissible for #1 SER Al. or is 1/0 SER Al. required. Code references please.
Thanks
Permissible for #1 SER Al. or is 1/0 SER Al. required. Code references please.
Thanks