My main panel is in my basement, which is connected to the meter on the other side of the foundation wall. Inside my main panel they bonded the neutral to the panel. The equipment grounding conductors are connected to the grounding bar which is attached to a cold water pipe. They are isolated from each other is this correct? P.s. this is not a sub-panel.