whofrankw
Member
- Location
- milford nj
I have a job where i need to change out 100 high hat trims to led. Im going to use Cree trims which are about $17 dollars and ill mark up a little and thinking about charging $10 bucks to change per trim. 6 require a 16 foot a frame and ill charge about 250 to bring that ladder to the job. Am I about accurate with my estimate? I thinking with upacking clean up i can change at least 8 and hour hopefully much faster.