Fred B
Senior Member
- Location
- Upstate, NY
- Occupation
- Electrician
How do you handle a GC who has other trades coming in after electrical rough in, and these other trades have created a violation of dedicated space by running water or sewer directly above or below the breaker panel, GC's comment is "the inspector let it go", or well if the inspector doesn't say anything we'll just let it be? I have this mostly in a residential setting where most of the subsystems are not engineered (blueprinted) in. I then have to come in to do the finish and have this staring me in the face with the implication on my workmanship, ie. "Who did this installation? ".