800A breaker has provision for (3) 500MCM conductors per phase and is marked #3/0AWG-500kcmil.
The manufacturer makes a UL listed lug kits for that breaker to accept (2) 600MCM conductors.
Should running two sets of 600MCM to that breaker with the lug kit installed pass or fail inspection?
The manufacturer makes a UL listed lug kits for that breaker to accept (2) 600MCM conductors.
Should running two sets of 600MCM to that breaker with the lug kit installed pass or fail inspection?