elec58
Member
- Location
- lake elsinore ca
Doing a TI project and was asked to use existing gear.  The problem is there is a 112kva transformer with #3cu  primary and #4/0 cu secondary feeding a 225 MCB panel  I am concerned on code violation and wasn't sure if this was legal. Since the #3 primary on a 112 is typically insufficient is it legal since it is only feeding a 200 amp panel board??  TIA
	
		
			
		
		
	
				
			 
				
 
 
		