Is it okay by code if I run 12/2 to my bugs and as a homerun then use 14/2 to my switch legs???????
C Chrisman1039 New member Location Lawrenceburg, Kentucky May 14, 2007 #1 Is it okay by code if I run 12/2 to my bugs and as a homerun then use 14/2 to my switch legs???????
iwire Moderator Staff member Location Massachusetts May 14, 2007 #2 Per forum rules I will close this thread as the poster is not in the electrical trade.