AWinston
Member
- Location
- Murrieta, Ca
I am working on a facility with a lot of HVAC and a lot of sub panels. I properly show the 125% demand factor for the largest motor on each sub panel. Does that 125% value on each panel follow all the way to the main switchboard? Or am I only supposed to show the 125% largest motor demand factor on the overall largest motor in the facility? We are well over the service size and I'm trying to find every possible solution.