Can I feed a 150A MCB panel with a 125A OCPD?
I know I've spoke on this before but have new info.
It's only for temporary install if that makes a difference?
 
That does not violate any NEC rules, whether temp or permanent.
FWIW, last I heard LADWP still requires a 150A service for a 150A panel, regardless of load or Main Breaker size.
 