blayton1212
Member
- Location
- Troy NY
I work in a large industrial environment, while working on any of the AC we always lockout and shutdown the Power. Currently we are installing a /grid tied solar farm and we need to feed the metering control panel in our Substation with 125VDC. I am Told we Do Not need to shutdown the power ( 125VDC ) to power the panel, and this because its DC ? I am not sure where to verify this ?