I can not find anything that considers an insulated HV line when talking about approach boundaries.
Is it legal to install HV sleeves into energized 15KV lines from scaffolding with or without rated hot gloves?
I know for uninsulated a EWP would need to be used but does that apply to an insulated line?
Thanks.
Is it legal to install HV sleeves into energized 15KV lines from scaffolding with or without rated hot gloves?
I know for uninsulated a EWP would need to be used but does that apply to an insulated line?
Thanks.