I think you are trying to be too brief. If I understand correctly, 200 amp 3 phase is the service, and it is sufficient to feed all loads as calculated per the requirements of the NEC. AND you are comfortable with the amount of additional amperage available for any future anticipated loads. If yes, then:
Why do you feel you need two "200" amp panels? Quotations because, what makes them 200 amp panels? Is that two 200 amp panels each fed from a 200 amp breaker at the service? Is it one 200 amp feeder with a 2 section panel?
Why do you need another one? As long as the loads are sufficient, you can just install two additional 100 amp breakers in the panel if there is room. Perhaps a sketch would describe what you are doing better.