Recently I've been asked to change a two-family house into a single family unit. Each unit has a 60 amp panel, and is fed from a two-meter box. Can I simply remove the two-meter box, install a single meter and upgrade the mast to 150 amps, I am looking at 230-40 Exceptions, will I need a disconnect outside next to the meter before I feed the two panels?
Does anyone have any ideas or a code reference?