I have been told in level one inspector training and in code classes that the
ground wire from meter to first rod is the grounding electrode conductor and
the wire from first ground rod to second ground rod is a bonding jumper.
so i can use 2 pieces of #6 bare and have 2 clamps on the first rod.
but i have one inspector who will not agree.