I looked at a job recently to replace the service cable and meter socket for a 2 family house. No big deal there but the inside is not typical and I'm curious as to how other contractors would handle this.
The left and center panels are for the first floor. Both are main breaker with the service conductors spiced in the old meter socket above.
My inclination is to make 1 the main panel and feed the second panel from that but also wondering if it would be acceptable to refeed the meter socket and leave it at that.
Also, feel free to comment on the quality of the existing work--I didn't do it![Smile :) :)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
The left and center panels are for the first floor. Both are main breaker with the service conductors spiced in the old meter socket above.
My inclination is to make 1 the main panel and feed the second panel from that but also wondering if it would be acceptable to refeed the meter socket and leave it at that.
Also, feel free to comment on the quality of the existing work--I didn't do it