A project I'm on now has a set up from the 70's.
it has 1- breaker, to a 3 to 5 contractors, to 2 or 3 overloads out to motors.
We are moving the whole system to a new cabinet PLC controlled.
The question of doing a few of the motors the same way came up.
Ive looked through 430 and ab .com haven't seen any thing specific.
any Knowledge of this ?
it has 1- breaker, to a 3 to 5 contractors, to 2 or 3 overloads out to motors.
We are moving the whole system to a new cabinet PLC controlled.
The question of doing a few of the motors the same way came up.
Ive looked through 430 and ab .com haven't seen any thing specific.