Panel has no room for neutral separation. 2 neutrals under same screw. Need to make all separate. No grounds left to double up and free up a screw.
Adding ground bars. Screwing to main panel casing, Which is a bonded neutral bar, and it the main breaker (neutral and grounds together point).
Can i add a ground bar and put neutrals on it. I never do. And don't like the practice. But their is no alternative. Usually its called adding a ground bar. But i never put neutrals on it.
Only alternative is to get a better panel. Older QO panel with small neutral/ground locations. Someone already tied up all the grounds together
Adding ground bars. Screwing to main panel casing, Which is a bonded neutral bar, and it the main breaker (neutral and grounds together point).
Can i add a ground bar and put neutrals on it. I never do. And don't like the practice. But their is no alternative. Usually its called adding a ground bar. But i never put neutrals on it.
Only alternative is to get a better panel. Older QO panel with small neutral/ground locations. Someone already tied up all the grounds together