A homeowner is building a large house on a property that already has a smaller existing house on it. The engineer wants to locate the large service for the new house (600 amp) on the existing house and feed the new house with a 600 amp feeder from the new service and also keep the existing service for the existing house. The engineer says 230.2 allows this installation since the new service does not serve the existing house as stated in 230.2; it is just mounted there. I see his point, but wonder is this the intent of 230.2? I suggested several options to eliminate the extra service, but he wants it this way.