pms13031
Member
- Location
- New Orleans, LA
Argument at my office about the meaning of the 20 foot length of one or more 1/2" rebars being a GE. Is the meaning one length of rebar at least 20 feet long, or can I consider four 5 foot lengths as a GE? :-?