A new full modular home is being delivered next week and I need the electrical specs for the 200 amp service and grounding.
I have two 5' galvanized ground rods to install and 30' of service wiring and the ground.
Do I need a 200 amp wire or not? I've seen arguements about 200 amp wiring is not really needed that 100+ amp wire will do, and is two Galv rods enough or should it be a solid copper ground rod?
Thanks
I have two 5' galvanized ground rods to install and 30' of service wiring and the ground.
Do I need a 200 amp wire or not? I've seen arguements about 200 amp wiring is not really needed that 100+ amp wire will do, and is two Galv rods enough or should it be a solid copper ground rod?