adagys
Member
- Location
- SW of Chicago
Ok, I haven't set a service in a while. I am installing a 200 amp underground meter socket and a 40 position panel. The AHJ used to make us run a #4 from the grounding bushing outside to the grounding bushing on the inside then to a ground lug inside the panel. He also required a #4 wire from the meter socket to the ground rod. Is this still alright, or how does anyone else do it?