I am building a 2000 amp service for a grocery store with no electrical plans of specs. I am planning on making five runs of 4 inch conduit with three runs of 600 mcm and one run of 500 mcm for the neutral. Is it still correct by code for me to drop a size on the neutral. Also I plan to run a 2/0 ground in your opinion is that the correct size for the service?
Last edited by a moderator:
