M mrdave Member Mar 27, 2008 #1 Does 2008 Nec require Running 4 wires from Main service disconnect to Feeder Panel? I'm installing Meter combo Panel at street and main feeder panel at house Planning on running Direct Burial URD cable. Does it need to be quad?
Does 2008 Nec require Running 4 wires from Main service disconnect to Feeder Panel? I'm installing Meter combo Panel at street and main feeder panel at house Planning on running Direct Burial URD cable. Does it need to be quad?
iwire Moderator Staff member Location Massachusetts Mar 27, 2008 #2 Closed, duplicate 2008 Feeder requirements