InkRF
Member
- Location
- West Michigan
- Occupation
- Electrical Engineer/Designer (Intern)
Howdy all,
I'm working on an addition to an existing building where an entire chunk of the building is being removed and another chunk (very technical wording, I know) is being added. I'm trying to do a service calc by doing [12 month peak demand * 125%] - [load removed] + [load added]. Are there any specific sections of the NEC that discuss how calculate the load removed from a system in particular, or is it a matter of demanding the connected loads based off their respective demand factors. For a sense of scale, the connected load to be removed is 68,693 VA.
Thanks!
I'm working on an addition to an existing building where an entire chunk of the building is being removed and another chunk (very technical wording, I know) is being added. I'm trying to do a service calc by doing [12 month peak demand * 125%] - [load removed] + [load added]. Are there any specific sections of the NEC that discuss how calculate the load removed from a system in particular, or is it a matter of demanding the connected loads based off their respective demand factors. For a sense of scale, the connected load to be removed is 68,693 VA.
Thanks!