We are in 2022,we have solar, we have EV, PV, PW and more, etc. - even the 200A service from electric company needs a bus that can carry the current from PV, battery or generator, in all directions.
SO as the min I was asked fora 400A bus, 200 disconnect breaker for near term PV solar addition and battery - all back feeding to the grid.
What load center to install today in order to avoid another replacement in 2 to 3 years.