E EEC Senior Member Location Maryland Apr 20, 2007 #1 Written labor units have 205 hours for 900KW generator. Do you think 205 hours are correct and why? Generator set on pad on parking lot area. Generator w/housing 37,000 lbs. How thick should pad be? Last edited: Apr 20, 2007
Written labor units have 205 hours for 900KW generator. Do you think 205 hours are correct and why? Generator set on pad on parking lot area. Generator w/housing 37,000 lbs. How thick should pad be?
mdshunk Senior Member Location Right here. Apr 20, 2007 #2 Correct, for what type of installation? Existing building, with genset going in sub-basement 3, no, that is not correct.
Correct, for what type of installation? Existing building, with genset going in sub-basement 3, no, that is not correct.