If a building is determined to qualify for 225.30(E) for having documented switching procedures; will each feeder still require
a service rated disconnect,
connected to a grounding electrode system
all building disconnects be grouped in one location
not exceed 6 switches?
I have a plan showing several feeders from another building supplying different panels thruoghout the building.
225.30(E) only exemps the installation from the one set of feeders.
	
		
			
		
		
	
				
			a service rated disconnect,
connected to a grounding electrode system
all building disconnects be grouped in one location
not exceed 6 switches?
I have a plan showing several feeders from another building supplying different panels thruoghout the building.
225.30(E) only exemps the installation from the one set of feeders.
 
				
 
 
		