The main incoming service to the building is 1200AMP/3P/208V
There is a C/T Cabinet and a Main Service Disconnect with a (8) Meter Bank (1 Blank Meter).
Each Meter has a 200AMP/208V/3P.
There were 7 stores but now now one store is taking over 2 stores.
I want to reuse the 200AMP for one store and I called out for a new meter from the meter bank for an additional 200AMP.
But the electrical inspector is saying 230.2 a building shall be supplied by only one electrical service.
Can a store have 2 separate service from the meter bank going into one retail space?
If so, what exceptions rule do I refer to from the NEC Code.
There is a C/T Cabinet and a Main Service Disconnect with a (8) Meter Bank (1 Blank Meter).
Each Meter has a 200AMP/208V/3P.
There were 7 stores but now now one store is taking over 2 stores.
I want to reuse the 200AMP for one store and I called out for a new meter from the meter bank for an additional 200AMP.
But the electrical inspector is saying 230.2 a building shall be supplied by only one electrical service.
Can a store have 2 separate service from the meter bank going into one retail space?
If so, what exceptions rule do I refer to from the NEC Code.