It is a small (8.6kW) commercial job in Los Angeles. I had planned to use 3 - 120/240 inverters and connect inverter 1 to phase A & B, inverter 2 to B & C and inverter 3 to C & A. However it was recomended to me that since B phase is a "stinger" I should connect only to A & B phases. I was told that pase B only comes into play for motor loads and that the other 2 phases carry the majority of the building electrical use. Is this correct? Will the main electrical meter register properly if only 2 phases are back fed?