mbrooke
Batteries Included
- Location
- United States
- Occupation
- Technician
When applying 240.92 (B), what OCPD clearing to normally to be assumed?
I'm getting around 1 second, however if someone drags a generator up to the building I can imagine an increased clearing time due to the reduced short circuit current at the service which would heat up the tap conductors more according to 240.92 (B).
I'm getting around 1 second, however if someone drags a generator up to the building I can imagine an increased clearing time due to the reduced short circuit current at the service which would heat up the tap conductors more according to 240.92 (B).