From what I understand grounding electrode conductors are to installed at the disconnect. This article also says at any accessibly point. I've noticed a few services lately that appear to be grounded at the trough located after the meter and before the disconnects switches. Not opening the equipment but it looks like the bonding and grounding is done in the trough but I would have expected that those grounding electrode conductors should be entering the disconnect switches and not the wireway.
Is it acceptable to ground/bond a service in the trough?
Thank you