Have a job(new residential construction), foundation, poured walls, and poured basement floor have no re-bar at all.With that being said, would grounding to the underground water pipe and a driven 8' rod meet the requirements? Had another contractor tell me that in addition to the underground water pipe he was required to drive (3) 8' rods to achieve the 20' figure in 250.52(A)(3). Thanks.