ty
Senior Member
- Location
- 3rd Rock from the Sun
I have a job to do a bunch of high voltage terminations. Around a dozen load break ells and some transfer switch 6-skirted terminations. All 25Kva rated. Pluse megger a bunch of secondaries.
The local utility won't perform the job, and they are concidering this to be private equipment, but they are requiring the builder use sub that is qualified.
I am the only one qualified to do the install at my company. Others coul;d do the work, but the utility won't allow it. I have no idea why, because this is private, and i can oversee the work, and all lines will be hi-pot tested and meggered.
I cant get all the terminations completed fast enough on my own. So if anyone else near me is qualified to do 25Kva load breaks, please send me a private message.
-Todd
The local utility won't perform the job, and they are concidering this to be private equipment, but they are requiring the builder use sub that is qualified.
I am the only one qualified to do the install at my company. Others coul;d do the work, but the utility won't allow it. I have no idea why, because this is private, and i can oversee the work, and all lines will be hi-pot tested and meggered.
I cant get all the terminations completed fast enough on my own. So if anyone else near me is qualified to do 25Kva load breaks, please send me a private message.
-Todd