2HR/Fire rating requirement for feeder &data network(NAC) conduits to the Presignal System Panel from the Fuse Cutout (FCO) & FACP?

Status
Not open for further replies.

msyed

Member
Location
NYC
Occupation
Engineer
What is the 2HR/Fire rating requirement for feeder &data network(NAC) conduits to the Presignal System Panel
(PSAP, provided in assembly areas over 1000 occupants) from the Fuse Cutout (FCO) & FACP(Fire Alarm Control Panel/Command Center) ?

THIS IS NOT FOR A HIGH RISE BUILDING BUT SPECIFICALLY, GROUP E, SCHOOL BUILDING.

Is 2HR fire rated enclosure for required for these feeder/network conduits based on NFPA 72 pathway survivability?
 