I have a commercial builder owner that wants to put a new meter and 100 amp panel for a diffent part of his building that he will be renting out. my question is this? the service drop to his building is a 3 phase 4 wire 240 volts. he wants me to put a single phase meter and panel from the 3 phase service drop. CAN I DO THIS BY THE NEC CODE? ALSO ON THE BUILDING IS TWO OTHER METERS WITH TO DISCONNECTS ON IT #1 IS A 200 AMP, THE OTHER IS A 100 AMP. HOW DO YOU DETERMINE DO THE SERVICE DROP HAS ENOUGH AMP? TO ADD ANOTHER 100 AMP METER AND PANEL?