Im installing EV chargers for the state, the utility pole that i am i stalling the panle and meterbox on currently has a 60A 3 phase disconnect for a pump/lift station.
It is being fed by 3-10kva pole mounted transformers 208/120.
Ive called the utility company but cant seem to get any help.
Will those 3-10kva transformers handle a 200a panel that would have 2-50a double poles for the EV chargers and 1-60A 3 pole breaker for the pump.
When i did my calculations i was told that the utiity company plays by different rules and doesnt use NEC like the rest if us. Haha
Im installing EV chargers for the state, the utility pole that i am i stalling the panle and meterbox on currently has a 60A 3 phase disconnect for a pump/lift station.
It is being fed by 3-10kva pole mounted transformers 208/120.
Ive called the utility company but cant seem to get any help.
Will those 3-10kva transformers handle a 200a panel that would have 2-50a double poles for the EV chargers and 1-60A 3 pole breaker for the pump.
When i did my calculations i was told that the utiity company plays by different rules and doesnt use NEC like the rest if us. Haha