Can you transition from a 4” Rigid conduit to a 3” using an RE with an Erickson. I don’t I’ve ever seen this before in my career so there’s always a first for everything.
Thanks. This job was for the power and grounding electrode conductors for a roof-top cell site atop an older 10-story apartment building. The feeder was 120/240v, 1ph and I think the GEC was 250 mcm.Nice. There were 2 existing risers and you extended them. A good application for RMC.