I have a job coming up that will utilize a 3 position meter socket without tenant mains. I the past, I've always delt with sockets containing tenant mains and I know the GEC gets landed in the exterior service equipment enclosure. Now in a service without any tenant mains, is there still a bonding jumper with a lug for the GEC or do I have to run the GEC into each of the panels where the OCPD is located?