vikingbass
New member
- Location
- Denver, colorado USA
I want to install 3/4 pvc or ENT in a 5" post tension slab parking garage deck with cars driving on the top. the rebar and post tension cables will make it impossble to maintain 2" below the conduit.
do you see a code issue with this? I know 2" must be maintained on the top of it. but does 300.5 note 2 indicate there needs to be a 2" "encasement " of the conduit?
that article seems to only apply to raceways that are "direct bury listed only"....
thanks for your help.
do you see a code issue with this? I know 2" must be maintained on the top of it. but does 300.5 note 2 indicate there needs to be a 2" "encasement " of the conduit?
that article seems to only apply to raceways that are "direct bury listed only"....
thanks for your help.